King-Abdulaziz-University-3

Image 4 of 4

Construction of King Abdulaziz University Hospital’s External Fence

Scope of Work: Construction of an external fence around the existing main building of King Abdulaziz University Hospital, 53 meters long, with a security room awarded on a design-build basis. The existing situation of underground utilities, infrastructure and RC structures of existing basements and car parks has been studied by examining as built drawings of the general site and RC roofs. Our scope included surveying, earthwork, construction of RC and steel elements, waterproofing works, sliding steel gates work, electrical and mechanical installations, and finishing works. 

King-Abdulaziz-University-3

Image 4 of 4

إنشاء السور الخارجي لمستشفى الملك عبد العزيز الجامعي

نطاق العمل: إنشاء سور خارجي حول مبنى مستشفى الملك عبد العزيز الجامعي الرئيسي القائم حالياً بطول 53 متر مع غرفة أمنية على أساس التصميم-البناء التعاقدي. وقد تمت دراسة الوضع القائم من خدمات أرضية وبنية تحتية وهياكل خرسانية من أقبية ومواقف سيارات موجودة بالفعل من خلال دراسة مخططات (كما تم بناؤه) للموقع العام والإنشائية للأسقف. وقد شمل نطاق عملنا أعمال المساحة والحفر وإنشاء العناصر الخرسانية والمعدنية وأعمال العزل المائي وأعمال البوابات الحديدية المتحركة والتمديدات الكهربائية والميكانيكية وأعمال التشطيب النهائي.